Electrical Efficiency

Overview:  A Minnesota community experiences odor problems in a municipal lagoon serving a turkey processing plant. The engineered solution is adding aeration to minimize the odors.

Solution:  The odor problem is corrected upon MBD installation.  In addition, the MBD solution with six 3 HP Model 600 units is $387,000 less than the second place bid. Electrical savings from 120 HP to 18 HP is 1,836 Kwh/day.  At $0.10Kwh, that equates to a savings of $184/day or $67,000/year.